Category:
CET-Rio announces the scheduled road closures for this Sunday (May 31st).
Published on 31/05/2026 - 18:25 | UpdatedRebouças Tunnel
The Rebouças Tunnel will be closed, in the direction of the city center, from 11 pm this Sunday (May 31st) to 5 am on Monday (June 1st), for revitalization work. The tunnels in the opposite direction will operate with one reversible lane (left) towards the city center and two traffic lanes towards Lagoa.
________
Elevation of the Flags
The lower deck of the Elevado das Bandeiras will be closed in the direction of São Conrado, from 11 pm this Sunday (May 31st) to 4:30 am on Monday (June 1st) for maintenance. The Barra – São Conrado connection will be made via the upper deck of the Elevado das Bandeiras, which will be operating in the direction of São Conrado.
Guidance for drivers
Drivers should pay attention to the signage installed in the area. CET-Rio operators will monitor traffic conditions and intervene if necessary. In addition, traffic light timings will be adjusted to improve traffic flow on detour routes and main corridors in the region.








