Scheduled road closures in tunnels and elevated roads in the city, this Friday (May 29).

Published on 29/05/2026 - 13:54 | Updated
  • Home/
  • /
  • Scheduled road closures in tunnels and elevated roads in the city, this Friday (May 29).

Elevated Engineer Freyssinet and Rufino Pizarro
The Engenheiro Freyssinet (over Avenida Paulo de Frontin) and Rufino Pizarro elevated roads will be closed for maintenance work, in the direction of the South Zone, from 11:50 pm this Friday (March 29th) to 5 am on Saturday (March 30th).

As an alternative route, drivers should take Avenida Paulo de Frontin and then access the Rebouças Tunnel.

___________
Elevated President Itamar Franco
The Luiz Jacques de Moraes Tunnel, the Presidente Itamar Franco Elevated Highway, and the Engenheiro Paulo César Marcellino Figueiredo Tunnel will be closed from 11 PM this Friday (May 29th) to 4:30 AM on Saturday (May 30th) for maintenance. The alternative route for drivers will be via the upper deck of the Bandeiras Elevated Highway, which will operate in the direction of Barra.

Guidance for drivers
Drivers should pay attention to the signage installed in the area. CET-Rio operators will monitor traffic conditions and intervene if necessary. In addition, traffic light timings will be adjusted to improve traffic flow on detour routes and main corridors in the region.

  • 29 May 2026
  • Jump to main content