City Hall completes construction of Ana Gonzaga West Park, the largest leisure area in the West Zone.

Published on 12/10/2026 - 14:04 | Updated on 16/10/2026 - 12:50
  • Home/
  • /
  • City Hall completes construction of Ana Gonzaga West Park, the largest leisure area in the West Zone.
The complex received approximately R$ 220 million in investments - Beto Soares/City Hall

The Rio de Janeiro City Hall has completed the construction of the Ana Gonzaga West Park in Inhoaíba, in the West Zone. Spanning 234 square meters, the complex includes sports, cultural, educational, and leisure facilities, among them a waterfall spanning over 1,1 square meters and the Olympic-sized swimming pool used in the Rio 2016 Games. Since its inception, the park has received approximately R$ 220 million in investment. The project was developed by the Municipal Urbanization Company (Rio-Urbe), and its execution was the responsibility of the Municipal Infrastructure Secretariat.

– The Ana Gonzaga West Park expands access to sports and leisure for the population in the West Zone. And, on this Children's Day, we inaugurated the park's waterfall for them to enjoy – declared Mayor Eduardo Cavaliere, during the inauguration, this Monday (10/12), of the final works.

The waterfall contains 200 liters of water, which goes through a treatment system and is reused, reducing waste. Next to it, the support building, with two floors and 855 square meters, houses changing rooms and a food court. The structure supports the activities carried out in the complex.

Two multi-sports courts and a sand court were also delivered. A Senior Citizens' Fitness Center was built to offer activities for the elderly, while the children's and recreation area, with almost 4 square meters, includes toys for children and rest areas with shaded spots. Three new kiosks were also installed to serve visitors. With the new equipment, the park has expanded the options for sports, leisure and social interaction for the population.

– We are concluding this fantastic project, which has transformed this region as part of our city's policy of expanding and creating new public and urban parks. It's the delivery of a new aquatic space so that people, especially children, can cool off on hot days – highlighted the Secretary of Infrastructure, Wanderson Santos.

History and first phase of the park

Where the Ana Gonzaga West Park is located today, part of the old Inhoaíba Farm, linked to the Gonzaga family, used to operate. The property was donated by Ana Gonzaga in 1930 and, two years later, began housing an orphanage. Decades later, the City Hall designed the park, inspired by the Madureira Mestre Monarco Park.

The first phase was opened to the public in September 2024. Among the facilities are the Roberto Burle Marx Water Staircase, with 88 steps, the Knowledge Center, with multi-purpose spaces and high-tech resources, and a skate park prepared to host street, bowl, and pump track competitions. Also inaugurated were a five-a-side football pitch, a multi-sports gymnasium, and the Zeca do Trombone Stage, an event space named in honor of the instrumentalist.

The West Palace, the main building and headquarters of the municipal administration in the region, was also delivered. With approximately 1.500 square meters distributed over two floors, the old mansion was completely renovated and received new facilities, air conditioning, and accessibility features. The chapel and a retention basin with a capacity to receive 18 million liters of rainwater, a volume similar to that of the large pool in Praça da Bandeira, completed the set of deliveries for the first phase of the works.

From Olympic sports to leisure.

During the second phase of construction, in December 2025, as part of the legacy of the Rio 2016 Games, the Ana Gonzaga West Park received the Olympic swimming pool used in the competition. Measuring 50 meters in length and with official dimensions, the structure began offering free swimming and water aerobics classes. In March 2026, the park gained a 250-meter-long observation deck, built at the highest point of the site and offering a view of the entire complex.

In July of this year, the Professor José Mauro da Silva Early Childhood Development Center (EDI) was inaugurated, serving 300 children from daycare to preschool. In August, it was the turn of the General Miranda Filho Educational and Technological Gymnasium (GET), which serves 720 students from the 1st to the 5th grade of elementary school. The Elite Division of the Municipal Guard – Municipal Force also began to have a base on the site, which received an administrative building for the workers responsible for the operation of the facility.

  • October 12th, 2026
  • Jump to main content